Thumbnail

CONTINUOUS PRECISE DISPLACEMENT MONITORING USING GPS FOR ASSESSING THE STABILITY OF SLOPES


ESTIMATE OF INDUCED SEISMICITY PARAMETERS OF GEOMECHANICAL OBJECTS BASED ON MATHEMATICAL MODELING USING LABORATORYTEST DATA AND FIELD OBSERVATION


LANDFILL WASTE - CRITICAL ASPECTS OF DESIGN AND CONSTRUCTION


INSTRUCTION AND ESSENTIAL OUTPUTS OF THE CROATIAN-JAPANESE RESEARCH PROJECT ON LANDSLIDES


SOIL POLLUTION AS A CONSEQUENCE OF MINING AND METALLURGICAL ACTIVITIES (STUDY CASES FROM FORMER YUGOSLAVIA)


LEGISLATION OF SLUDGE DISPOSAL FROM WWTP IN FBIH


SOLUTION FOR PROTECTION OF SITE (CONSTRUCTION PIT) DURING CONSTRUCTION HE JANJICI


APPLICATION OF MULTI-CRITERIA METHODS IN GEOPHYSICAL INVESTIGATIONS


SAMPLE OF ENGINEERING-GEOLOGICAL AND GEOTEHNICAL PARAMETERS OF DAM LOCATION PROFILE OF THE HE '


PILE INTEGRITY TESTING USING THE SONIS INTEGRITY TEST (PILE INTEGRITY TEST)


FOUNDATIONS IN THE FORM OF GRILL WITH MOUNTING AB BUILDINGS WITH HEAVY LOADS AND POOR GEOTECHNICAL PROPERTIES


STRENGTH PROPERTIES OF MICROFINE CEMENT STABILIZED HIGHLY PLASTIC CLAY


DOTTED DATABASE AS A BASIS FOR DRAFTING AND UPDATING OF CADASTRE OF LANDSLIDES


METODOLOŠKI PRISTUP I FAZE MONITORINGA KLIZIŠTA


NATURAL WASTEWATER TREATMENT SYSTEMS


GEOTECHNICAL CONDITIONS FOR THE T-1 TUNNEL CONSTRUCTION ON THE VC CORRIDOR ZVIROVIĆI-POČITELJ


PROJECT PORTONOVI, KUMBOR, MONTENEGRO – „MIXED-IN-PLACE (MIP®)” – GROUND IMPROVEMENT


CREATING OPEN EDUCATIONAL RESOURCE ON EXAMPLE OF LABARATORY ROCK TESTING PRACTICE


EXAMPLE OF DESIGN AND INSTALLATION OF SBR DEVICE, CAPACITY 1000 PE, FOR SANITARY WASTEWATER TREATMENT


THE USE OF NEW MATERIALS IN CONSTRUCTION OF NEW LANDFILLS AND CLOSURE OF THE OLD ONES


EXAMPLE USE OF PUMP STATION FOR FLOODPLAINS


SURVEYING CONTROL GEOMETRY OF ANTENNA TOWER BASE


MOVING OF TERRAIN STRICT AN URBAN AREA IN TUZLA UNTIL 2016


THE FOUNDATION-SOIL INTERACTION AND BUILDING RECOVERY BY MICROPILES


SOME SPECIFIC CHARACTERISTICS OF GEOTECHNICAL EARTHQUAKE ENGINEERING


SOLUTION OF REHABILITATION OF LANDSLIDE AT CONSTRUCTED INDIVIDUAL RESIDENTIAL BUILDING ON THE PART 1869/2 SLAVINOVIĆI-TUZLA


IZVLAČENJE POTOPLJENOG ROTORNOG BAGERA SRS 401 BR. 1 POVRŠINSKOG KOPA ŠIKULJE U LUKAVCU


ANCHORS IN THE SYSTEM COMBINED SUPPORT


STABILIZATION OF GEOTECHNICAL PARAMETERS OF UNBOUND SOIL IN THE UNDERGROUND MINE ROOF


STATE LANDSLIDES AND A DEGREE OF STABILITY WITHIN THE BOUNDARIES OF SEPARATED CONSTRUCTION LAND OF THE MUNICIPALITY GRADAČAC


TECHNICAL SOLUTION AND ANALYSIS OF DISCOUNTINOUS RC PILE SUPPORT STRUCTURE FOR PROTECTION OF THE EXCAVATION PIT OF THE FLATIRON BUILDING IN SKOPJE


BODOVANJE STIJENSKE MASE PRILIKOM GRADNJE TUNELA 1. MART (VIJENAC) I POGODNOSTI PRIMJENE PRAVILNIKA GEOTEHNIČKIH MISIJA

Najava konferencija, simpozija i radionica

Sponsors